Layout model and usable dimensions
A panel fence purchase starts with the fence run, but gates and end conditions change the counts. This calculator subtracts a gate opening from a straight run, divides the remaining fence into bays no wider than your chosen limit, and counts the posts and rails for those bays. It treats a gate opening as a separate segment between dedicated posts. The result is a material planning estimate for one straight run. Corners, stepped ground, shared end posts, and multiple gates should be broken into separate runs and reconciled on a sketch before ordering.
Fit, direction and offcut constraints
- A gate away from an end divides the fence into two panel runs. Round each side separately for the final purchase count.
- Panel products may be sold by exact nominal or actual widths. Use the dimension appropriate to the installation detail.
- Post depth, foundations, wind resistance, and property restrictions require project-specific decisions beyond this quantity estimate.
Layout arithmetic and example
A worked example
A 100 ft run with a 4 ft gate leaves 96 ft of panels. At 8 ft per bay, that is 12 panels, 14 posts including gate boundaries, and 24 rails with two courses.
Measure and compare a layout
- Measure the complete straight boundary run.
- Record the gate opening and select whether it forms a separate segment.
- Choose a supported panel width and count rail courses from your fence design.
Frequently asked questions
How many fence posts do I need for 100 feet?
Without a gate, an 8 ft maximum bay gives 13 bays and 14 posts. Gates and separate runs can add posts.
Does the calculator include a gate kit?
No. It accounts for the opening and boundary posts, but hinges, latch, gate frame, and hardware are separate.
Can a corner post be counted twice?
Yes, if you calculate each run separately. Reconcile shared corner posts on the layout drawing before purchasing.
Read the project guides
- Fence Material Takeoff: Posts, Pickets, Gates and Equal Spacing
Break a fence into runs, account for gate openings, lay out posts, count pickets, and estimate finish for the surfaces actually coated.
Calculation method: JICWH methodology. Examples are planning assumptions, not product recommendations.